Here is the Master Bathroom before the renovations (Pictures are from the previous owners)
Demolition Time !!!
Cleanup… Removal of old shower, removal of old tile and wall between shower and closet.
Framing the shower, installation of sub-floor, pouring of first concrete slab and plumbing of shower fixtures.
Installation of waterproof membrane, insulation, vapor-barrier and electrical work.
Pouring of 2nd concrete slab over the waterproof membrane, and installation of heated floor pad.
Installation of ceramic tile outside of shower, installation of cement board in Shower.
Drywall and waterproofing of the shower.
Mudding and taping the drywall, painting walls and ceiling, starting to install vanity, also installed toilet and ceramic tile on the shower floor.
Installation of Tiles inside the shower.
Installation of Grout, Shower Fixtures, baseboards and trims.
Final Product… installation of glass door and decorations.